Waka Kotahi (NZTA), in association with IDS, welcome you to attend FREE workshops to gather your feedback about what information you require from the next version of the LTPP programme.
What the LTPP has achieved to date
Over the past 19 years, the New Zealand LTPP has been one of the cornerstones for the development of advanced analytics to forecast maintenance and renewals on road pavements in New Zealand.
Across 63 LTPP sites on the state highway network and more than 80 sites on local council roads, the programme has collected invaluable data and information.
Inventory data, including surface and pavement information;
Annual manual condition survey data from the calibration survey contractor including roughness, rutting, texture and visual rating;
FWD survey data; and,
Maintenance history data submitted directly to the NZTA.
The programme delivered on the questions from the industry that ranged from the way we collect data, how fast our pavements deteriorate, understanding pavement strength and material performance.
It has been instrumental in establishing a research area in New Zealand to develop skills amongst practitioners, many now associated with the NZTA and local government.
Your data needs moving forward
Most LTPP sites have gone through a full cycle of resurfacing and/or rehabilitation and there is a general need to review the make-up and future use of the programme’s performance data.
It’s important we have the industry’s input into shaping the LTPP programme’s future data needs and use. We want to hear from the industry where the knowledge gaps are in pavement design and long-term performance.
Join us at the workshops and tell us what you need from LTPP-II .
Auckland - Wednesday 05 February 2020
10am – 2pm with a 30min break for lunch
Note: Lunch will be provided
Auckland University Newmarket Engineering Campus.
Room 903-252
314-390 Khyber Pass Road
Newmarket, Auckland 1023
Note: All visitors to the campus must first register at reception – ground floor.
Christchurch - Tuesday 18 February 2020
10am – 2pm with a 30min break for lunch
Note: Lunch will be provided
NZ Transport Agency
CAPTIF Road Research Centre
2 McLeans Island Road
Christchurch 8051
Wellington – Thursday 05 March 2020
10am – 2pm with a 30min break for lunch
Note: Lunch will be provided
WSP
33 The Esplanade
Petone
Lower Hutt 5012
Comments